Over the past two days a lot of the floor preparation and the stud work for the walls has been completed. In some places we discovered some quite challenging problems - the floor of this end of the barn is very uneven, so to lay the base struts for the stud work required more even surfaces. Have a look at this bit of the floor at one end of what will be the larder - underneath some lumps in the floor which we tried to level we found a very large quartz rock, which had to be removed and the surface around it chipped away to make it level:
But the development feels like a reality now and we are really excited about it.